The Right Context, Not All of It
Written deliberately as a lesson rather than a product story, taught through The Curator v3.80.0.
In the first article, I named the phases: Context Engineering, The Build Phase, Production and Deployment. That naming had an unintentional effect. By calling Phase One “Context Engineering,” I implied that context engineering was something you did once — at the beginning — and then left behind. Students interpreted the three phases as sequential and cleanly separated. Do the context work. Then build. Then deploy.
NO TRACKING COOKIES
This site sets no cookies while you read it, and its analytics count pages, not people. Lumina, the assistant on every page, runs in the EU and is built for the GDPR and the EU AI Act.